ERIE INTERMODAL TRANSPORTATION CENTER
ERIE, PENNSYLVANIA
The design of this new 55,000 SF facility located on Erie’s Bayfront, contains 2 major dome elements
which house sales and waiting areas for the Erie Metropolitan Transit Authority, retail shops, and a
coffee shop on the first floor.
  The second floor consists of various sized community conference rooms
and offices for the Erie-Western Pennsylvania Port Authority.
   This state-of-the-art facility is heated and
cooled using geothermal, ground source technology.
       
ERIE WATER WORKS
ERIE, PENNSYLVANIA
In 2002, the historic Chestnut Street Pump Station was renovated and became an asset to Erie's
Bayfront.  An addition of 6,000 square feet was added on to the existing pump station for a service
and exhibit area that reflected the architectural style of the original building.  The transformation of
the original building included the renovation and replacement of the existing water pumps,
electrical service and process equipment.  The Chestnut Street Pump Station showcases the
illuminated Big Bertha, a historical 4-story steam engine.  Big Bertha was cited a Pennsylvania
Historical Mechanical Engineering Landmark in 1981.
   
NEW POLICE STATION & BOROUGH HALL RENOVATION - Borough of Emmaus
EMMAUS, PENNSYLVANIA
In recognizing the importance of shaping the physical, intellectual and social environment in which Borough residents and administrators work, the Borough of Emmaus engaged in a process to establish a vision for its Borough Hall and its development over time.  The Borough hired RMP architects to analyze existing conditions, tabulate existing space utilization, project future space needs and develop a Master Plan for physical improvements to the existing building and site.  RMP based the Master Plan upon the Borough’s identified needs and developed it as a dynamic tool to be reviewed, refined and updated over time.  Its principles and guidelines articulate an enduring and timeless vision for the Borough of Emmaus.  As a result of the Master Plan, the Borough of Emmaus will build a new Police Station and renovate the Borough Hall, with both projects being designed by RMP.  Phase 1 is a new 10,570 sf Police Station facility located on an adjacent block to the existing 8,800 sf Borough Hall.  The new facility will features a public reception area with the Mayor's office, administrative offices and work rooms, Detective and Sergeant offices surrounding a patrol squad room, secure detainee processing area, holding cells, interrogation rooms, secure evidence storage and evidence processing labs, locker rooms, lounge, training room, bicycle storage, an eight car garage, and a two car secure garage.  The new Police Station's site placement will also create a plaza to accommodate community events.
Public Works Projects
 
CITY OF ERIE PUBLIC WORKS - Municipal Garage
ERIE, PENNSYLVANIA
 R   O   T   H     M   A   R   Z     P   A   R   T   N   E   R   S   H   I   P     P.  C.